IRON RIVER, MI— Construction on US-2 in Iron River begins next week.
The Michigan Department of Transportation is resurfacing 2.3 miles of the highway, from Gibbs City Road to Ninth Avenue. Work includes asphalt cold milling and resurfacing, catch basin repairs, sidewalk ramp work, and pavement markings.
Motorists should expect intermittent single-lane closures with traffic shifts.
The $1.1 million project is expected to be completed by the end of July.