ISHPEMING, MI – The Tilden Mine is resuming iron ore pellet production after being stopped for about a week to replace an electric cable. Cleveland-based Cliffs Natural Resources’ says pellet production is scheduled to resume Friday night at the mine near Ishpeming.
Pellet production stopped May 10 after a high temperature reading was found in the cable.
Another shutdown is planned in early June for maintenance.