© 2024 WNMU-FM
Upper Great Lakes News, Music, and Arts & Culture
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations

Construction on UP bridges slated for May 15

IRON AND ONTONAGON COUNTIES, MI— Repairs on three bridges in Iron and Ontonagon counties starts on Monday.

Affected bridges include US-45 over the east branch of the Ontonagon River, M-64 over the Mineral River, and M-69 over the Paint River.

Work includes a deep overlay; epoxy overlay; joint replacement; deck, railing, and substructure patching; curb and gutter repairs; guardrail installation; and approach work.

The repairs on all three bridges are expected to be completed in October.

Nicole was born near Detroit but has lived in the U.P. most of her life. She graduated from Marquette Senior High School and attended Michigan State and Northern Michigan Universities, graduating from NMU in 1993 with a degree in English.